The prefabricated board for MET station’s switch room of Saudi Arabia SWCC project is installed completed and it was checked and accepted on time by supervisor.
MET switch room connects with transformer room and pump station, which has one hundred and thirty three piece top boards and fifty four piece wall boards, too much multileveled work which brought a lot of difficulties for the erection work. The staff of project made out safely and reliable lifting plan after careful research, which was carried out reasonably, finally the prefabricated board work was completed with high efficiency and quality, which brought good reputation from clients and supervisor, and would facilitate the following work.
(Saudi Arabia Branch Company, Xu Zhihao and Li Junjie reported)
Editer:FangYuan