The first heaviest equipment of Fujian Baihong PTA Project was successfully hoisted
At 16:00 on January 5th, the secondary distillation column in the main unit area with 57m height, 6.6m in diameter and 550T in weight, was successfully hoisted in place, which is the heaviest equipment of the Fujian Baihong PTA project undertaken by the Ninth Sub-Company of ELECO since the start of the lifting of the large-scale equipment.